Water Reservoir: jebel Ali, CW/380A/2003

Sub Contractor: Al Hijaz Mechanical Equipment CO. L.L.C.
Client: Dubai Electricity &..Water  Authority   (DEWA)
Consultant: MJS Consultant
Reservoir Volume:

60 Million Gallons

Project Period: 6months
Main Contractor: United Engineering Const. (UNEC) L.L.C.
Scope: Pipework. Electromechanical Work (E&..M) &.. Instrumentation

)ebel Ali Water Reservoir

The project consisted of the construction of a single 60 million gallon reinforced concrete water reservoir with interconnection of the pipes to the existing pipelines, including the PLC/SCADA control, telecommunication system interfacing with the existing MCC in addition to the CCTV surveillance system water quality analysers.