Contract No. MW/3085 Operation & Maintenance of Chemical treatment plant for General Maintenance Directorate (300 m3/day) |
Abu Dhabi |
G.H.Q Armed Forces |
G.H.Q Armed Forces |
Design and Build of Chemical Treatment Plant |
2001 |
Dubai Liquid Waste Treatment Facility for Chemical Neutralization system (7.5 m3/batch) |
Dubai |
Dubai Aluminium Company |
Tebodin Middle East |
Design and Build of Chemical Treatment Plant |
2000 |
PJ1003 Integrated Hazardous Waste Treatment Plant Chemical Treatment plant, Oil Separation plant & Evaporation Ponds for all Dubai Emirate (240 m3/day) |
Dubai |
Dubai Municipality |
Acer Freeman Fox |
Design and Build of Chemical Treatment Plant |
1999 |
GHQ Project EC620 – Sweihan, Abu Dhabi Chemical waste treatment plant for chromium, cyanide, heavy metal. (300 m3/day) |
Abu Dhabi |
G.H.Q Armed Forces |
G.H.Q Armed Forces |
Design and Build of Chemical Treatment Plant |
1990 |